Dusky Posted February 23, 2023 Report Posted February 23, 2023 (edited) HQM Quarry 1 Low Grade Fuel will output 1 HQM Ore, Max fuel to use in Quarry is 1800 Low Grade, Output will be 1800 HQM Ore. 10 Low Grade will take 3.05 minutes to process, 500 Low Grade will take 2 Hours and 34 minutes to process, 1800 Low Grade will take 9 Hours and 15 minutes to process. Sulfur Quarry 1 Low Grade Fuel will output 4 Sulfur Ore, Fill the 6 Fuel slots a Total of 3000 Low Grade. Output will be 12000 Sulfur Ore. 10 Low Grade will take 3.15 minutes to process, 500 Low Grade will take 2 Hours and 42 minutes to produce, 3000 Low Grade will take 16 Hours and 25 minutes to process. Stone Quarry 1 Low Grade Fuel will Output 4 metal Ore and 20 Stone, Max Fuel to use is 750 Low Grade. Outputs will be 3000 Metal Ore & 15000 Stone. 10 Low Grade will take 3 minutes to process, 500 Low Grade will take 2 Hours and 30 minutes to process, 750 Low Grade will take 3 Hours and 45 minutes to process. Public Quarry's have a Max of 6 fuel slots and a Max of 18 output slots. Only Tested on AU Pure. Edited February 24, 2023 by Dusky Addeed Process Times
BigDave Posted May 24, 2023 Report Posted May 24, 2023 A good overview, except the process times are incorrect. I have tested this extensively and found that ALL the quarries and pumpjacks on AU pure convert 1 LGF to the relevant output material every 20seconds EXACTLY. i.e. HQM: 1LGF to 1HQM every 20sec 10 LGF to 10 HQM every 200sec (3min 20sec) 500 LGF to 500HQM HQM every 10,000 sec (2 hours 47min) 1,800 LGF to 1,800 HQM every 36,000 sec (10 hours) SULFUR QUARRY: 1 LGF to 4 sulfur ore every 20sec 10 LGF to 40 sulfur ore every 200sec (3min 20sec) 500 LGF to 2,000 sulfur ore every 10,000 sec (2 hours 47min) 3,000 LGF to 12,000 sulfur ore every 60,000 sec (16 hours 40min) STONE QUARRY 1 LGF to 20 stone and 4 metal ore every 20sec 10 LGF to 200 stone and 40 metal ore every 200sec (3min 20sec) 500 LGF to 10,000 stone and 2,000 metal ore every 10,000 sec (2 hours 47min) 750 LGF to 15,000 stone and 3,000 metal ore every 15,000 sec (4 hours 10min) PUMPJACKS 1 LGF to 1 crude oil every 20sec 10 LGF to 10 crude oil every 200sec (3min 20sec) 500 LGF to 500 crude oil every 10,000 sec (2 hours 47min) 3,000 LGF to 3,000 crude oil every 60,000 sec (16 hours 40min) This can be very easily tested by just running a stopwatch and checking lap times every time the quarry/pumpjack outputs. I haven't gotten more that a few hundredths of a sec either side of 20sec on ALL the quarries and pumpjacks. i.e. their process times are identical. The one difference is the FIRST processing, which can be anywhere from 0sec (immediately) to 20sec after you place the LGF in. I assume the quarry/pumpjack continually cycles every 20sec so if you put your LGF when the cycle has 10 secs to go then you'll get a time of 10sec for 1LGF the first time then every 20sec thereafter, so 30sec for 2LGF, 50sec for 4 etc which will throw your calculations out.
Recommended Posts
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now